275V 2P Type 2 SPD Surge Protective Device - China Suppliers & Factory for Reliable Transient Voltage Protection
Product principle and working conditions
- Meets Class II (8/20μs) SPD tests
- Based on zinc oxide technology
- Using 34S MOV, the maximum will be up to 8/20μs 40kA
- No power frequency continuous flow
- Compact, yet high surge rated pluggable design, using minimum 35mm DIN rail width
- The operating environment temperature is -40℃~+80℃
- Red/Green status indication and change-over contacts standard for remote monitoring. (Remote function is option)
Technical parameter details
| Technical Data | |||||
| POLE | 2P/2+0 | ||||
| Technology | MOV(Metal Oxide Varistors) | GDT | |||
| Protection mode(s) | L-PE/N-PE | NPE | |||
| Nominal voltage (A.C.) [Un] | 220V | 300V | 380V | 400V | 225V |
| Max.continuous operating voltage (D.C.) [Ucpv] | 275V | 320V | 385V | 420V | 225V |
| Nominal discharge current(8/20μs) [In] | 20kA | 20kA | |||
| Max.discharge current (8/20μs) [lmax] | 40kA | 40kA | |||
| Protection level [Up] | ≤1.5kV | ≤1.6kV | ≤1.8kV | ≤2.0kV | ≤1.5kV |
| Response time [tA] | ≤25ns | ||||
| Temporary overvoltage(TOV) withstand - 5 sec [Ut] | 335V | 440V | 440V | 620V | 335V |
| Admissible short-circuit current [lsccr] | 25kA | ||||
| Max, backup fuse | 63AgL/Gg | ||||
Mechanical Data
| Mechanical Data | ||||
| Current | AC system | |||
| SPD configuration | Single/Three phase | |||
| Pluggable | Available | |||
| Mounting | 35mm DlN rail | |||
| Housing material | Thermoplastic,UL 94 V-O | |||
| Operating temperature | -40℃...+80℃ | |||
| Protection rating | IP20 | |||
| Remote Signaling | Green/Red | |||
| Wiring for remote signaling | Optional | |||
| Max.Voltage/Current for remote signaling | Max 1.5mm solid/flexible | |||
| Standards compliance | 250V/0.1A;125V/0.2A;75V/0.5A | |||
| Certification | CE, CB, RoHS,TUV | |||
Outer appearance and installation dimensions
Installation considerations
- 1. Make sure the electricity is turned off before installation. It is completely forbidden to operate when electrified.
- 2. It is advised to connect a circuit breaker or fuse in series with the surge protection module's front end.
- 3. During installation, adhere to the installation schematic for connection. Steer clear of bad connections. Close the circuit breaker (or fuse) switch after installation, then make sure everything is operating normally.
- 4. After installation, make sure the surge protection module is operating properly by putting it in place.
- 5. Check the condition of the fault display window and conduct routine inspections of the surge protection module while in use. The surge protection module needs to be changed or repaired right away if the fault display window turns red or if the remote signaling terminal emits an alert signal.
- 6. It is recommended to install parallel-connected power surge protection devices. The connection wires need to be straight, short, thick, dependable, and secure.
Frequently Asked Questions (FAQ)
What is the maximum discharge current for this surge protective device?
The maximum discharge current (Imax) for this device is 40kA (8/20μs), utilizing a high-performance 34S MOV design to handle high surge ratings safely.
How does the status indicator work, and what should I do if it turns red?
The device features a Red/Green visual status indicator. Green indicates normal operation. If the indicator turns Red, or if the optional remote signaling terminal triggers an alert, the surge protection module has reached its end of life and must be replaced immediately.
What are the temperature and environmental requirements for operation?
This surge protective device is designed to operate reliably in harsh environments, with an operating temperature range of -40℃ to +80℃ and an IP20 protection rating.
Can this module be mounted on standard industrial rails?
Yes, the device features a compact, space-saving design that mounts onto standard 35mm DIN rails, making it easy to integrate into existing electrical distribution panels.
What safety precautions should be taken during installation?
Always turn off the power source before starting the installation. It is highly recommended to connect a circuit breaker or fuse in series at the front end, and ensure all wiring is short, straight, thick, and securely connected.
