China Suppliers Factory Type 2 SPD Surge Protection Device 1200V 2-Pole for High-Voltage PV Systems
Model Meaning
Product Principle and Working Conditions
- Meets Class II (8/20μs) SPD tests.
- Based on advanced zinc oxide technology.
- Using 34S MOV, the maximum will be up to 8/20μs 40kA.
- No power frequency continuous flow.
- The operating environment temperature is -40°C ~ +80°C.
- Remote signaling function is optional.
- When the product falls, the green window turns to red and remote signaling provides remote alarm function.
Technical Parameter Details
| POLE | 2P/2+0 | ||||
| Technology | MOV (Metal Oxide Varistors) | GDT | |||
| Protection mode(s) | L-PE / N-PE | NPE | |||
| Nominal voltage (A.C.) [Un] | 220V | 300V | 380V | 400V | 225V |
| Max. continuous operating voltage (D.C.) [Ucpv] | 275V | 320V | 385V | 420V | 225V |
| Nominal discharge current (8/20μs) [In] | 20kA | 20kA | |||
| Max. discharge current (8/20μs) [Imax] | 40kA | 40kA | |||
| Protection level [Up] | ≤1.5kV | ≤1.6kV | ≤1.8kV | ≤2.0kV | ≤1.5kV |
| Response time [tA] | ≤25ns | - | |||
| Temporary overvoltage (TOV) withstand - 5 sec [Ut] | 335V | 440V | 440V | 620V | 335V |
| Admissible short-circuit current [Isccr] | 25kA | ||||
| Max. backup fuse | 63AgL/Gg | ||||
Mechanical Data
| Mechanical Data Specifications | ||||
| Current | AC system | |||
| SPD configuration | Single / Three phase | |||
| Pluggable | Available | |||
| Mounting | 35mm DIN rail | |||
| Housing material | Thermoplastic, UL 94 V-O | |||
| Operating temperature | -40℃ ... +80℃ | |||
| Protection rating | IP20 | |||
| Remote Signaling | Green / Red Indicator | |||
| Wiring for remote signaling | Optional | |||
| Max. Connection Terminal | Max 1.5mm² solid/flexible | |||
| Standards compliance | 250V/0.1A; 125V/0.2A; 75V/0.5A | |||
| Certification | CE, CB, RoHS, TUV | |||
Outer Appearance and Installation Dimensions
Installation Considerations
- Before installation, ensure power is disconnected. Operating while energized is strictly prohibited.
- It is recommended to install a fuse or circuit breaker in series at the front end of the surge protection module.
- Follow the installation diagram for connection during installation. DC+ is the positive pole, DC- is the negative pole, and PE is the ground wire. Avoid incorrect connections. After installation, close the circuit breaker (or fuse) switch and check if the operation status is normal.
- After installation, insert the module into place and verify if the surge protection module is functioning correctly.
- During use, regularly inspect the surge protection module and check the status of the fault display window. If the fault display window turns red or if the remote signaling terminal outputs an alarm signal, it indicates a malfunction of the surge protection module, which should be promptly repaired or replaced.
- Parallel-connected power surge protection modules should be installed in parallel. The connection wires must be secure, reliable, short, thick, and straight.
Frequently Asked Questions (FAQ)
What does it mean when the indicator window turns red?
The indicator window shows the status of the device. Green indicates normal operation, while red indicates that the surge protection module has malfunctioned and needs to be promptly replaced.
What is the operating temperature range for this surge protector?
This device is designed to operate reliably in harsh environment temperatures ranging from -40°C to +80°C.
How should the surge protection module be mounted?
The module is designed for standard pluggable installation on a 35mm DIN rail, making setup and replacement quick and simple.
Is it necessary to turn off the power during installation?
Yes, before beginning installation, you must ensure the power is completely disconnected. Operating while the system is energized is strictly prohibited for safety reasons.
What certifications does this surge protection device have?
This product complies with international safety and quality standards and is certified by CE, CB, RoHS, and TUV.
How should the wiring be configured during installation?
Follow the installation diagram carefully: connect DC+ to the positive pole, DC- to the negative pole, and PE to the ground wire. Ensure all connections are secure, short, thick, and straight.